A single-line diagram for a commercial building: utility feed through a main transformer to a 480V switchboard, then to lighting panels, HVAC equipment, and an emergency generator with ATS
Diagram Examples from Real Visitor Prompts
Browse eligible diagrams shared by FreeDiagram visitors, inspect the exact prompts, and build your own version.
Browse 3253 real creationsSingle Line Diagrams
Showing 25–48 of 196. No stock examples or system defaults. Choose a tool, study a real result, then reopen its prompt as your starting point.
Create a professional electrical Single Line Diagram (SLD) for a grid-connected solar PV power plant with AC-coupled battery energy storage. Use standard IEC electrical symbols and a clear, engineering-grade layout. 1. Solar PV Array * Total number of PV modules: 1,560 modules. * Module manufacturer: aiko. * Module rated power: 670 Wp each. * Total installed DC capacity: 1,045.2 kWp. * Distribute the PV array across 8 GoodWe 125 kW inverters. * Show the PV strings connected to the respective inverters, with appropriate DC isolators and DC surge protection devices (SPDs) where applicable. 2. PV Inverters * Quantity: 8 units. * Manufacturer: GoodWe. * Rated AC power: 125 kW per inverter. * Total inverter AC capacity: 1,000 kW. * Provide a dedicated 250 A circuit breaker for each inverter. * Connect all eight inverter feeders to a common AC distribution busbar. 3. Main AC Protection * Main circuit breaker: 2,000 A. * Manufacturer: Siemens. * Connect the main breaker between the common AC busbar and the main point of connection. * Show appropriate AC surge protection, grounding, and protection devices as required by the final electrical design. 4. Battery Energy Storage System (BESS) * Manufacturer: GoodWe. * Battery energy capacity: 7 unit of261 kWh per battery system. * Configuration: AC-coupled battery storage system. * Show the battery system connected on the AC side through its dedicated bidirectional battery inverter / PCS, with the required AC circuit breaker, isolation, and protection. * Clearly distinguish the battery system from the PV inverters. 5. Metering and Grid Connection
Create a professional electrical Single Line Diagram (SLD) for a grid-connected solar PV power plant with AC-coupled battery energy storage. Use standard IEC electrical symbols and a clear, engineering-grade layout. 1. Solar PV Array * Total number of PV modules: 1,560 modules. * Module manufacturer: aiko. * Module rated power: 670 Wp each. * Total installed DC capacity: 1,045.2 kWp. * Distribute the PV array across 8 GoodWe 125 kW inverters. * Show the PV strings connected to the respective inverters, with appropriate DC isolators and DC surge protection devices (SPDs) where applicable. 2. PV Inverters * Quantity: 8 units. * Manufacturer: GoodWe. * Rated AC power: 125 kW per inverter. * Total inverter AC capacity: 1,000 kW. * Provide a dedicated 250 A circuit breaker for each inverter. * Connect all eight inverter feeders to a common AC distribution busbar. 3. Main AC Protection * Main circuit breaker: 2,000 A. * Manufacturer: Siemens. * Connect the main breaker between the common AC busbar and the main point of connection. * Show appropriate AC surge protection, grounding, and protection devices as required by the final electrical design. 4. Battery Energy Storage System (BESS) * Manufacturer: GoodWe. * Battery energy capacity: 7*261 kWh per battery system. * Configuration: AC-coupled battery storage system. * Show the battery system connected on the AC side through its dedicated bidirectional battery inverter / PCS, with the required AC circuit breaker, isolation, and protection. * Clearly distinguish the battery system from the PV inverters. 5. Metering and Grid Connection * Include a bidirectional energy meter at the main point of connection to the utility grid. * Show the utility grid, point of common coupling (PCC), and the main metering arrangement. * Clearly indicate the direction of power flow for both grid export and battery charging.
Create a professional electrical Single Line Diagram (SLD) for a grid-connected solar PV power plant with AC-coupled battery energy storage. Use standard IEC electrical symbols and a clear, engineering-grade layout. 1. Solar PV Array * Total number of PV modules: 1,560 modules. * Module manufacturer: aiko. * Module rated power: 670 Wp each. * Total installed DC capacity: 1,045.2 kWp. * Distribute the PV array across 8 GoodWe 125 kW inverters. * Show the PV strings connected to the respective inverters, with appropriate DC isolators and DC surge protection devices (SPDs) where applicable. 2. PV Inverters * Quantity: 8 units. * Manufacturer: GoodWe. * Rated AC power: 125 kW per inverter. * Total inverter AC capacity: 1,000 kW. * Provide a dedicated 250 A circuit breaker for each inverter. * Connect all eight inverter feeders to a common AC distribution busbar. 3. Main AC Protection * Main circuit breaker: 2,000 A. * Manufacturer: Siemens. * Connect the main breaker between the common AC busbar and the main point of connection. * Show appropriate AC surge protection, grounding, and protection devices as required by the final electrical design. 4. Battery Energy Storage System (BESS) * Manufacturer: GoodWe. * Battery energy capacity: 261 kWh per battery system. * Configuration: AC-coupled battery storage system. * Show the battery system connected on the AC side through its dedicated bidirectional battery inverter / PCS, with the required AC circuit breaker, isolation, and protection. * Clearly distinguish the battery system from the PV inverters. 5. Metering and Grid Connection * Include a bidirectional energy meter at the main point of connection to the utility grid. * Show the utility grid, point of common coupling (PCC), and the main metering arrangement. * Clearly indicate the direction of power flow for both grid export and battery charging.
Industrial plant motor control center with VFD drives
A single-line diagram for a SOLAR ROOFop project Mana Y. Al Hammam Cont. Est. commercial building Solar grid tie-in with inverter huawei 60 kw dc 72.27 kwp 99 * 730 trina pv module,acdb - 125 A,PV-DG SYNC CONTROLLER PANEL TO SYNC sec 220 v (L-L)/127 V (L-N) MAIN AC BUS BAR -400 A, Existing ATS (FOR DG - SEC MAnual ) 2 NOS DG SAME CAPCITY (467.5 KA 0.8 PF,220 V (L-L),127 V(L-N) WITH EMERGENCY ATS FOR SEC - DG , NOW WE NEED SOLAR TO SEC TO DG CONFIDURED ATS
A single-line diagram for a SOLAR ROOFop project Mana Y. Al Hammam Cont. Est. commercial building sec 220 v (L-L)/127 V (L-N) MAIN AC BUS BAR -400 A, Existing ATS (FOR DG - SEC MAnual ) - 2 NOS DG SAME (467.5 KA 0.8 PF,220 V (L-L),127 V(L-N)
A single-line diagram for a industrial building for a feeder circuit from the switchgear to a panelboard in the office: Transformer Rating 15 kVA 3-Phase, 600V Primary / 208Y/120V Secondary Switchgear Breaker 15 A, 3-Pole Thermal-Magnetic Breaker @ 600V Primary Feeder Conductors 3 # 14 AWG + 1 # 14 AWG Ground RW90 Copper Primary Conduit 1/2-inch EMT Secondary Feeder Conductors 3 # 8 AWG + 1 # 8 Neutral + 1 # 10 Ground RW90 Copper (50 A rated run) Secondary Conduit 1-inch EMT
A single-line diagram for a industrial building: The diagram should include, Transformer Rating 15 kVA 3-Phase, 600V Primary / 208Y/120V Secondary Switchgear Breaker 15 A, 3-Pole Thermal-Magnetic Breaker @ 600V Primary Feeder Conductors 3 # 14 AWG + 1 # 14 AWG Ground RW90 Copper Primary Conduit 1/2-inch EMT Secondary Feeder Conductors 3 # 8 AWG + 1 # 8 Neutral + 1 # 10 Ground RW90 Copper (50 A rated run) Secondary Conduit 1-inch EMT
a feeder circuit from the 3 phase 600v switchgear to a panelboard in the office. show the use and size of a circuit breaker in the switchgear
A single-line diagram for a commercial building: utility feed through a main transformer to a 480V switchboard, then to lighting panels, HVAC equipment, and an emergency generator with ATS
Create a Single-line diagram: i Have two AC power sources. One RAW power and one more is UPS Power. RAW power source will be connected to AC 25AMPS MCB. From there it is distributed to a 3 Sockets 10A Junction box and a Mitsubishi Fx5u CPU. The 10A 3 Sockets will be connected to 3 Industrial PC with input 230V AC and 7.5Amps. Next Comes the UPS Power UPS power source will be connected to AC 25AMPS MCB. Here there are multiple Distibutions. the power is first distributed to a single socket 6A. where we will connect TV with 230VAC, 1Amps input. Next distibuted to two sockets of 6A. Where the first socket is connected to Monitor (230V AC 1A). second socket is connected to HUB(230VAC 1A) Next the power is connected to two MCB with 6A each. Now from each MCB it is connected to four SMPS which has input of 230VAC 3A and provides output of 24vDC. from each smps we will connect to two relays(24V DC input) the relay input will connected from PLC and each relay has two common and two NO and two NC. Common will be connected from smps and from each NO we will connect one light with an input of 24V DC. Like this we will connect 16 lights using 8 relays in which every two relays are connected to one smps. Next distribution is we will connect 8 Exhaust Fans which needs input power of 230VAC 2A combinely for all exhaust fans. I want to add contractor details project details. Client details
Draw a single line diagram for the following: from the existing square d QMB364w, Series E1 switchboard (3 pole, 70a fuses), use the existing 3 conductor #1awg teck90 to run to the new 45kva 480v/600v step up transformer (54.1a primary/43.3a secondary). from the transformer, run 3 conductor #2awg teck90 to a 100a, 600v, 3 pole fusible disconnect with 80a fuses installed (A4J80 fuses). from the disconnect, run 3 conductor #2awg teck90 to the new Ingersoll Rand RS22ne air compressor (600v, 3 phase 40a, integral VFD 30HP motor)
Single line diagram: 380v utility to UPS to UPS DB with 200A Main Isolator to Busbars to 15x 20A 3pole MCBs and 10x 20A 2pole MCBs
Home scheme
Civil circuit
Solar plus grid tie-in with inverter and net metering disconnect
Residential SLD with 200A service, utility meter, Microgrid controller (EG4GridBOSS) and 200A Loads panel, the back up generation is provided by a 12kW hybrid inverter that is connected to a battery and also a photovoltaic array
Residential SLD with 200A service, utility meter, Microgrid controller (EG4GridBOSS) and 200A Loads panel
i want to replicate a single line diagram
A single-line diagram for a clinic: utility feed through 240V switchboard, then to lighting , HVAC equipment, and sockets
A single-line diagram for 12v on a private boat NB840: one start battery 12v 125ah, one house bank 2x 12v 125ah. Batteries equipped with 300a mrbf fuses on battery poles. 70mm2 wires on batteries. From house battery 70mm2 to main switch for victron lynx distributor. Lynx distributor has 5 fuses/distrubutions; house: 140A 35mm2 to house main switch then 35mm2 from main switch to blue sea safetyhub 150 fuse panel. From safety hub there is 40A/10mm2 for 12V deck socket outlet, 60A/16mm2 to fuse panel inside cabin, 5A/2,5mm2 for cerbo gx, 10A 2.5mm2 for water pump
Create a Single-line diagram: Installation of 3 Tesla V4 Supercharger posts, 1 V3.5 Power Cabinet and 1 site controller, Main Supply 800A MCCB 630A, 4-pole MCCB, LSIG, 50kA, set at 528A. Outgoing 4-pole MCCB, minimum 500A, with emergency stop. 3 × 20A SPN MCBs. The system requires a 380–480V, 465A, three-phase + N + PE supply. Power cables must be suitable for the specified 480A requirement, with separate protective earthing conductors. Emergency & Shutdown: Emergency stop arrangements must be provided at the charging stalls.
Create a Single-line diagram: Installation of 3 Tesla V4 Supercharger posts, 1 V3.5 Power Cabinet and 1 site controller, Main Supply 800A MCCB 630A, 4-pole MCCB, LSIG, 50kA, set at 528A. Outgoing 4-pole MCCB, minimum 500A, with emergency stop. 3 × 20A SPN MCBs. The system requires a 380–480V, 465A, three-phase + N + PE supply. Power cables must be suitable for the specified 480A requirement, with separate protective earthing conductors. Emergency & Shutdown: Emergency stop arrangements must be provided at the charging stalls. with cable size of 250 meter