Genera este esquema
Diagram Examples from Real Visitor Prompts
Browse eligible diagrams shared by FreeDiagram visitors, inspect the exact prompts, and build your own version.
Browse 3261 real creationsMain diagram studio
Showing 73–96 of 1256. No stock examples or system defaults. Choose a tool, study a real result, then reopen its prompt as your starting point.
iran-us war in 2026
iran-usa war in 2026
iran and use war 2026
Create a UML Class Diagram for a simple academic project named College Lost and Found Portal. The website allows students and college staff to submit lost-item reports, submit found-item reports, view listings, and search or filter items. Use a simple design with only the necessary classes. ItemReport: * itemID: integer (primary key) * itemName: string * category: string * description: string * reportType: string (Lost or Found) * date: date * location: string * contactInfo: string Operations: * addReport() * updateReport() * deleteReport() * searchItems() * getReportDetails() Do not add login, payment, notifications, or other unplanned features. Keep the diagram readable and suitable for a college project report.
Create a clean, professional 16:9 organizational infographic for a public-sector HR management project. Use a white background, navy blue and teal accents, simple icons, readable typography, and five numbered sections arranged in a balanced layout. All visible text must remain in Catalan. Preserve the exact wording of the supplied labels. Do not translate, invent, or modify any roles. Title: MAPA D'ACTORS DEL PROJECTE EQUIP PROMOTOR Direcció General / Regidoria Responsable de Recursos Humans — Cap de Nòmines i Prestacions RESPONSABLES DEL PROJECTE Cap de Projecte de RH — Cap de Nòmines i Prestacions Cap de Projecte d'IT — Cap de Servei de Població ALTRES SERVEIS Contractació Gestió Econòmica / Comptabilitat Assessoria Jurídica Delegat/da de Protecció de Dades ACTOR EXTERN Empresa adjudicatària USUARIS Usuaris de gestió: responsables de RH i comandaments intermedis. Usuaris finals: tota la plantilla, mitjançant el Portal de l'Empleat. Show the five sections as distinct visual groups. Prioritize clarity, hierarchy, and legibility. Do not invent reporting lines. Create a polished institutional infographic suitable for a formal presentation.
A flowchart of a new-user onboarding flow from signup to first activation, with a verification branch
Generate an ANSI/ISA-5.1-2024 P&ID diagram for Heated Pultrusion Die, Puller Tracks, and Flying Cut-off Saw. EQUIPMENT: - EQ-DAD-201: Tri-Zone Heated Pultrusion Die. - EQ-PUL-201: Continuous Caterpillar Puller Mechanism (VFD-driven). - EQ-SAW-202: Flying Diamond Cut-Off Saw with Pneumatic Carriage. INSTRUMENTATION & CLOSED LOOPS: - LOOP 201 (Die Thermal Profile): * TIC-201A: Zone 1 Preheating Temp Controller (Setpoint: 100.0 °C, Alarm TAH-201A > 120 °C). * TIC-201B: Zone 2 Gelation Temp Controller (Setpoint: 130.0 °C, Alarm TAH-201B > 150 °C). * TIC-201C: Zone 3 Final Curing Temp Controller (Setpoint: 150.0 °C, Alarm TAH-201C > 170 °C). - LOOP 202 (Pulling Speed & Load): * SIC-202: VFD Speed Controller for EQ-PUL-201 (Setpoint: 0.30 m/min, Low Alarm SAL-202 < 0.15 m/min). * JIT-202: Pulling Force Load Cell Transmitter (Nominal: 4.5 kN, Jamming Alarm JAH-202 > 12.0 kN). - SAW CONTROL: * LIT-204: Optical Length Sensor on EQ-SAW-202 (Setpoint: L = 180.0 mm ± 0.2 mm). SAFETY INTERLOCKS: - Interlock [I-201]: Red dashed line from JIT-202 (JAH-202 > 12 kN trigger) to Safety Logic [I-201], sending trip signal to immediately stop SIC-202 puller motor. - Interlock [I-202]: Red dashed line from LIT-204 length sensor to [I-202] to synchronize saw carriage pneumatic movement with continuous profile speed. CONNECTIONS: - Main Process Line (thick black): Impregnated composite profile through EQ-DAD-201 -> EQ-PUL-201 -> EQ-SAW-202. - Electrical Signals (dashed): All TIC, SIC, JIT, LIT sensors to DCS.
Generate an ANSI/ISA-5.1-2024 P&ID diagram for Secondary Finishing, Plasma Surface Treatment, and PU Coating of Ankle Joints. EQUIPMENT: - EQ-QC-101: Quality Inspection Station 1 (Dimensional & Sink marks). - EQ-CNC-101: CNC Milling & Deburring Machine for pivots. - FCV-105: Air Blow Solenoid Valve. - EQ-QC-102: Roughness (Ra < 1.6 µm) and Tolerance Inspector. - EQ-PLS-101: Atmospheric Plasma Surface Activation Unit. - EQ-COAT-101: PU Spray Coating Booth & Curing Oven (60.0 °C). - EQ-NDT-101: ASTM E1742 Radiographic & Cross-Hatch Inspection Station. INSTRUMENTATION & CONTROL LOOPS: - SIC-105: CNC Spindle Speed Controller on EQ-CNC-101 (Setpoint: 3,500 RPM, Low Alarm SAL-105 < 3,000 RPM). - FIC-106 & EIC-106: Plasma Gas Flow & Power Controller on EQ-PLS-101 (Setpoint > 48 mN/m surface energy, Alarm EAL-106 < 48 mN/m). - PIC-107: Spray Pressure Controller on EQ-COAT-101 (Setpoint: 2.5 bar, Pneumatic line). - TIC-107: Curing Oven Temp Controller on EQ-COAT-101 (Setpoint: 60.0 °C, Low Alarm TAL-107 < 55.0 °C). CONNECTIONS: - Main Process Line (thick solid line): Part transportation sequence EQ-QC-101 -> EQ-CNC-101 -> EQ-QC-102 -> EQ-PLS-101 -> EQ-COAT-101 -> EQ-NDT-101. - Pneumatic Signal Line (double slashed / dashed): PIC-107 to Spray Nozzle and FCV-105 air supply. - Digital Signals (dashed): SIC-105, EIC-106, TIC-107 to Central PLC.
Generate an ANSI/ISA-5.1-2024 P&ID diagram for Secondary Drilling, Edge Sealing, Coating, and Mechanical NDT of Composite Holders. EQUIPMENT: - EQ-QC-201: Barcol Hardness Inspection Station (> 45 Barcol). - EQ-DRILL-202: CNC Drilling Machine with Brad-Point Carbide Drill and Sacrificial Backing Plate. - EQ-QC-202: 10x Optical Inspection Station for Delamination. - EQ-SEAL-202: Epoxy Edge Sealer Applicator & Curing Oven (80.0 °C, 15 min). - EQ-COAT-202: Topcoat PU Application & Thickness Monitor. - EQ-NDT-202: ISO 10328 Proof Load Testing Machine (P5 = 2,688 N) + ASTM D570 Gravimetric Test. INSTRUMENTATION & CONTROL LOOPS: - SIC-205: Drill Spindle Speed Controller (Setpoint: 3,200 RPM, Alarm SAL-205 < 2,800 RPM). - FIC-205: Drill Feed Rate Servo Controller (Setpoint: 0.04 mm/rev, High Alarm FAH-205 > 0.08 mm/rev). - TIC-206: Epoxy Curing Oven Temp Controller on EQ-SEAL-202 (Setpoint: 80.0 °C, Low Alarm TAL-206 < 70.0 °C). - AIT-207: In-line Optical PU Film Thickness Analyzer on EQ-COAT-202 (Setpoint: 40 µm, Range: 30 - 50 µm, Low Alarm AAL-207 < 30 µm). CONNECTIONS: - Main Process Line (thick black): Part travel sequence EQ-QC-201 -> EQ-DRILL-202 -> EQ-QC-202 -> EQ-SEAL-202 -> EQ-COAT-202 -> EQ-NDT-202. - Electrical Signal Lines (dashed): SIC-205, FIC-205, TIC-206, AIT-207 to DCS/PLC.
Generate an ANSI/ISA-5.1-2024 P&ID diagram for Fiber Creel and Resin Impregnation Stage of a Pultrusion Line. EQUIPMENT: - EQ-CRL-201: Unidirectional Glass Fiber Creel (E-Glass Rovings 0°). - EQ-BAT-201: Unsaturated Polyester Resin Impregnation Bath with Jacket Control. - FCV-203: Resin Supply Control Valve (Fail Closed - FC). INSTRUMENTATION & CLOSED LOOPS (LOOP 203): - TIV-201: Mechanical Tension Indicator/Control Valve on EQ-CRL-201 (Setpoint: 15.0 N, Low Alarm TAL-201 < 5 N). - LIT-203: Capacitive Resin Level Transmitter in EQ-BAT-201 (Setpoint: 30 cm, Low Alarm LAL-203 < 10 cm, controlling FCV-203). - VIC-203: In-line Rotational Viscometer (Setpoint: 0.30 - 0.60 Pa·s / 450 cP at 23 °C, High Alarm VAH-203 > 0.60 Pa·s). - TIC-203: Bath Temperature Controller (Setpoint: 23.0 °C, High Temp Alarm TAH-203 > 28.0 °C). CONNECTIONS: - Main Process Line (thick black): Glass Fiber Roving path from EQ-CRL-201 through EQ-BAT-201 resin bath to die inlet. - Fluid Feed Line: Resin supply tank through FCV-203 into EQ-BAT-201. - Electrical Signal Lines (dashed): LIT-203, VIC-203, TIC-203 to DCS/PLC.
Generate an ANSI/ISA-5.1-2024 P&ID diagram for an Injection Molding Unit for rPET-GF45. EQUIPMENT: - EQ-INJ-101: Hot Injection Molding Machine with Screw Barrel and Nozzle. - PSV-102: Pressure Relief Safety Valve on Hydraulic Line (Fail Open - FO). - EQ-TCU-101: Mold Temperature Control Unit (120.0 °C). INSTRUMENTATION & CLOSED LOOPS: - LOOP 101 (Tri-Zone Thermal Profile): * TIC-101A: Temp Controller Zone 1 Feed (Setpoint: 270.0 °C, RTD Pt100). * TIC-101B: Temp Controller Zone 2 Plastification (Setpoint: 285.0 °C, RTD Pt100). * TIC-101C: Temp Controller Zone 3 Nozzle (Setpoint: 285.0 °C, RTD Pt100). * High Temp Alarm TAH-101 > 300.0 °C. - LOOP 102 (Holding Pressure): * PT-102: Piezoelectric Pressure Transducer in Cavity/Nozzle. * PIC-102: PID Pressure Controller (Setpoint: 80.0 MPa / 120 bar hydraulic, High Alarm PAH-102 > 140 bar). - LOOP 104 (Mold Crystallization Control): * TIC-104: TCU Temp Controller (Setpoint: 120.0 °C, Low Temp Alarm TAL-104 < 110.0 °C). SAFETY INTERLOCKS: - Interlock [I-101B]: Red dashed line from PIC-102 (PAH-102 trigger) to [I-101B], sending trip signal to de-energize EQ-INJ-101 screw motor and open PSV-102 (FO). - Interlock [I-101C]: Red dashed line from TIC-104 (TAL-104 trigger) to [I-101C], sending interlock signal to block injection trigger. CONNECTIONS: - Main Process Line (thick black): Polymer melt flow to Mold. - Thermal fluid loop (thick line): EQ-TCU-101 to Mold cooling channels. - Electrical signals (dashed): All TIC, PT, PIC to DCS/PLC.
Create a professional high-level architecture diagram titled “High-Level Design of CSLM-IDE” for a B.Tech CSE project report. Use a white background, landscape layout, blue-accented rectangular blocks, readable black text and directional arrows. Organize the system into layers: 1. User Layer: Developer. 2. Presentation Layer: Title Bar, Activity Bar, Explorer, Monaco Code Editor, AI Assistant Panel, Terminal and Output, Status Bar, Settings. 3. Application Logic Layer: Workspace Management, Editor State, File Operations, Search, Keyboard Shortcuts, Conversion Request Coordinator. 4. Core Services Layer: AI Code Conversion Module, Language and Prompt Configuration, Validation and Error Feedback. 5. External Systems: Local File System, Gemini AI Model API, Installed Language Runtimes and Compilers. Connect the layers logically. Show filesystem access, AI request/response, and run/build interactions. Label this as a high-level design, not proof that every feature is implemented. No 3D effects, no decorative illustrations, no overlapping arrows. Keep every label legible.
un organisgramme pour ma synthèse
A flowchart explaining Internet of things(IoT) architecture
привет , мне нужно сделать блок схему к документу. что тебе нужно для этого я могу предоставить исходный рисунок над которым можно дальше работать
Create a clean, professional, academic research paradigm for a quantitative correlational study entitled “Relationship Between Numeracy Intervention and Numeracy Skills of Grade 11 Learners.” Use the Independent Variable–Dependent Variable framework, NOT the IPO model. Layout: 1. On the left, create a rectangular box labeled “INDEPENDENT VARIABLE.” Inside, write “Numeracy Intervention.” 2. On the right, create a rectangular box labeled “DEPENDENT VARIABLE.” Inside, write “Numeracy Skills of Grade 11 Learners,” with these indicators: Basic Mathematical Operations; Number Sense; Mathematical Problem-Solving. 3. Connect the two boxes with a horizontal, double-headed arrow to represent the relationship being investigated between the variables. Do not imply cause and effect. Design requirements: simple formal academic style, white background, black text, thin black borders, equal-sized horizontally aligned boxes, readable serif font similar to Times New Roman, correct spelling, landscape page, no unnecessary icons or decorations, suitable for Chapter 1 of a senior high school research paper. Add this caption below the diagram: “Figure 1. Research Paradigm Illustrating the Relationship Between Numeracy Intervention and Numeracy Skills of Grade 11 Learners.” Ensure the diagram is appropriate for a correlational study and contains only the specified variables and indicators.
now this Map out a linear User Flow diagram using connecting arrows to show step-by-step screen navigation. 1. HOME PAGE Open app • View featured items 2. MENU / SEARCH Browse lunch, snacks, drinks or favourites • Search items 3. DIETARY FILTERS Select vegetarian, vegan, gluten-free or allergen filters 4. ITEM DETAILS View description and price • Customise item 5. ADD TO CART Choose quantity • Add selected item 6. CART Review items • Edit quantities • Check total 7. CHECKOUT Choose collection time • Confirm order details 8. PAYMENT Select payment method • Complete payment 9. ORDER CONFIRMATION View order number and estimated pickup time CAN U MAKE IT IN PORTRAIT FORM
now this Map out a linear User Flow diagram using connecting arrows to show step-by-step screen navigation. 1. HOME PAGE Open app • View featured items 2. MENU / SEARCH Browse lunch, snacks, drinks or favourites • Search items 3. DIETARY FILTERS Select vegetarian, vegan, gluten-free or allergen filters 4. ITEM DETAILS View description and price • Customise item 5. ADD TO CART Choose quantity • Add selected item 6. CART Review items • Edit quantities • Check total 7. CHECKOUT Choose collection time • Confirm order details 8. PAYMENT Select payment method • Complete payment 9. ORDER CONFIRMATION View order number and estimated pickup time
An org chart for a small team with a manager, three engineers, and a designer
Create a flowchart for a student result system. Take marks as input, check whether marks are between 0 and 100, then determine Pass if marks are 40 or above and Fail otherwise. Include input validation, decision branches, output and Start/End symbols.
Create a flowchart to check whether a number entered by the user is even or odd. Include Start, Input Number, a decision diamond to check if the number is divisible by 2, Yes and No branches, display the result, and End. Use standard flowchart symbols and label all arrows clearly.
Generate a flowchart for an online shopping system, from selecting a product to adding it to the cart, checking stock, making payment, confirming the order, and arranging delivery. Include branches for out-of-stock products and failed payments.
An org chart for an organisation . the chairman , two directors underneath and then a managing director with them then at the next tier under the managing director a chief operating officer . then in the tier under the chief iperating officer we have the hr/ admin managher , Business and developmentr manager , finance manager , head procurement , head of engineering and design and then a head of enterprise and IT systems then under the it sysstems we have an it assistant . its for a tehcnical report so it should be of that standard and be beautiful as well as simple